Project-Shanda College Hot Water Project

This project starts operation in 2019 and in total 15 units of 140kW CO₂ heat pumps are used for heating supply (with 7 units as backup in extreme weather). The ambient tempreture is around -30℃ in winter and the CO₂ heat pumps work smoothly with an excellent performance.